Works for the elevation of eight crossroads on the Km 4 bypass in the governorate of Sfax

Works for the elevation of eight crossroads on the Km 4 bypass in the governorate of Sfax – LOT N°1: Carrefours RL911 & Kayed Mohamed and RR81

DETAILS


  • Customer: Ministry of Equipment and Housing
  • Location: Sfax - Tunisia
  • Works start date: 01 March 2018
  • Works end date: May 2022


DESCRIPTION

Carrefour RL911: Construction of two juxtaposed structures with decks in continuous reinforced concrete slabs with a total length of 254.30 m each
Carrefour Kayed Mohamed-RR81: Construction of two juxtaposed structures with decks in continuous prestressed concrete and reinforced concrete slabs with a total length of 836 m each